12 Inch tunnel down center

This is the 12 inch diameter tunnel down the center that replaces the fuel tank. Two 9.5dia motors coupled end to end will fit inside the 12 inch positive pressure tunnel. Room enough for third motor in line! Got to think about that.

(click to close)